article · Transactions of the Society of Instrument and Control Engineers · 1997
Interior Point Method for Utility Plant Optimization
Masahiko Murai, Yutaka Iino, Takashi Shigemasa
Cited by 0Open access
Abstract
This paper focuses on the re-scheduling problem for utility plant operation. The optimal scheduling problem is described as LP model, and solved by the primal affine scaling algorithm. We try to re-optimize the perturbed LP model using warm-start. Numerical example shows that the warm-start solve the problem about half the time which the cold-start does.
Cite this paper
Murai, M., Iino, Y., & Shigemasa, T. (1997). Interior Point Method for Utility Plant Optimization. Transactions of the Society of Instrument and Control Engineers, 33(12), 1184–1186. https://doi.org/10.9746/sicetr1965.33.1184
Murai, Masahiko, et al. “Interior Point Method for Utility Plant Optimization.” Transactions of the Society of Instrument and Control Engineers, vol. 33, no. 12, 1997, pp. 1184–86, https://doi.org/10.9746/sicetr1965.33.1184.
Murai, Masahiko, Yutaka Iino, and Takashi Shigemasa. 1997. “Interior Point Method for Utility Plant Optimization.” Transactions of the Society of Instrument and Control Engineers 33 (12): 1184–86. https://doi.org/10.9746/sicetr1965.33.1184.
Murai, M., Iino, Y. and Shigemasa, T. (1997) ‘Interior Point Method for Utility Plant Optimization’, Transactions of the Society of Instrument and Control Engineers, 33(12), pp. 1184–1186. Available at: https://doi.org/10.9746/sicetr1965.33.1184.
@article{murai1997interior,
title = {{Interior Point Method for Utility Plant Optimization}},
author = {Murai, Masahiko and Iino, Yutaka and Shigemasa, Takashi},
journal = {Transactions of the Society of Instrument and Control Engineers},
volume = {33},
number = {12},
pages = {1184--1186},
year = {1997},
doi = {10.9746/sicetr1965.33.1184}
}Made from the index record. Check names, capitalisation and page numbers against the paper. Need another style? AI for Research has over 10,000.