Skip to content
Free planNo credit card requiredStart writing

article · International Journal of Industrial and Operations Research · 2020

Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study

Ukamaka Cynthia Orumie

Cited by 31Open access

Abstract

The project evaluation and review technique (PERT) and critical path method (CPM) were applied in a building construction company. Different activities involved in the house construction project were described. The earliest events, latest commencement and completion of activities were determined using Forward and Backward pass computations in CPM. Critical paths were determined using both CPM and PERT. Based on the analysis, it was shown that the completion of the house project using CPM was almost the same with that of PERT such that the difference between both techniques was only one day.

Cite this paper

APA 7

Orumie, U. C. (2020). Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study. International Journal of Industrial and Operations Research, 3(1). https://doi.org/10.35840/2633-8947/6504

MLA 9

Orumie, Ukamaka Cynthia. “Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study.” International Journal of Industrial and Operations Research, vol. 3, no. 1, 2020, https://doi.org/10.35840/2633-8947/6504.

Chicago

Orumie, Ukamaka Cynthia. 2020. “Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study.” International Journal of Industrial and Operations Research 3 (1). https://doi.org/10.35840/2633-8947/6504.

Harvard

Orumie, U.C. (2020) ‘Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study’, International Journal of Industrial and Operations Research, 3(1). Available at: https://doi.org/10.35840/2633-8947/6504.

BibTeX
@article{orumie2020implementation,
  title = {{Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study}},
  author = {Orumie, Ukamaka Cynthia},
  journal = {International Journal of Industrial and Operations Research},
  volume = {3},
  number = {1},
  year = {2020},
  doi = {10.35840/2633-8947/6504}
}

Made from the index record. Check names, capitalisation and page numbers against the paper. Need another style? AI for Research has over 10,000.

A PERT-CPM tutorial

H. S. Swanson, Robert E. D. Woolsey · ACM SIGMAP Bulletin · 1974

Cited by 5