Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge
F M Russo, Jason B. Beecher, John W Lang
Cited by 1Abstract and details only
Abstract
The Girard Point Bridge is a double deck truss bridge carrying I-95 in the City of Philadelphia, PA. The three main spans are a cantilever-suspended truss with plate girder floorbeams used predominantly in the main span supporting both decks. Cracking of the floorbeam to truss connections was observed to progress and become more numerous in numbers over several inspection cycles in the past decade. Field measurements of displacements and strains were correlated to global and local finite element models and determined that relative displacement of the floorbeam and truss were the driving force for crack growth. Use of a softening approach was implemented at the floorbeam to truss chord connection to provide additional flexibility. Trial connections were constructed and monitored and the final design was slightly modified based on the experimental results. The resultant softened connection dramatically reduced the measured stress ranges.
Cite this paper
Russo, F. M., Beecher, J. B., & Lang, J. W. (2006). Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge.
Russo, F M, et al. “Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge.” 2006.
Russo, F M, Jason B. Beecher, and John W Lang. 2006. “Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge.”
Russo, F.M., Beecher, J.B. and Lang, J.W. (2006) ‘Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge’.
@article{russo2006diagnosis,
title = {{Diagnosis and Retrofit of Floorbeam to Truss Connections in the Double Deck Girard Point Bridge}},
author = {Russo, F M and Beecher, Jason B. and Lang, John W},
year = {2006}
}Made from the index record. Check names, capitalisation and page numbers against the paper. Need another style? AI for Research has over 10,000.
Related papers
Fatigue investigation and retrofit of double-deck cantilevered truss I-95 Girard Point Bridge
Khaled Mahmoud · CRC Press eBooks · 2015
Cited by 0
Evaluation and retrofit of floorbeam cracking on a tied arch bridge
Robert Connor, Ian C. Hodgson, John W. Fisher · Bridge Structures · 2005
Cited by 0
Finite Element Analysis of Fatigue Cracking due to an Incompatibility in Floor Beam and Deck Slab Bending
Michael J. Urban · 2006
Cited by 0
Investigation and Retrofit of Distortion-Induced Fatigue Cracks in a Double-Deck Cantilever-Suspended Steel Truss Bridge
Yi Zhou, Jason B. Beecher, Mark R. Guzda et al. · Journal of Structural Engineering · 2014
Cited by 12
Fatigue Crack Formation and Repair Strategies for Steel Floor Beam Tie Plates due to Secondary Displacements on Plate Girder-Stringer Bridges
Clay J. Naito, Xiang Li, Ian C. Hodgson et al. · Transportation Research Board 90th Annual MeetingTransportation Research Board · 2011
Cited by 0
Field Monitoring Prototype Retrofits of Floorbeam Connections on the I-95 Girard Point Bridge
Hassam N. Mahmoud, Robert Connor · 2005
Cited by 0
Evaluation of Stresses at Connection Plate Gap Details on a CrossGirder Using Finite Element Analysis and Field Measurements
Hussam N Mahmoud, Ben T. Yen, Jian Guo Jin et al. · 2006
Cited by 0
Distortion-Induced Fatigue Cracking of a Non-Composite Steel Girder-Floorbeam-Stringer Bridge
John M. Kulicki, Dennis R. Mertz, R E Murphy et al. · Springer eBooks · 1990
Cited by 0