Skip to content
Free planNo credit card requiredStart writing

Search 250 million research papers

Read the abstract, see who wrote it and who cites it, and get the citation in APA, MLA, Chicago or Harvard.

About 10,000 papers for “Superstructure”

Superstructure

Shurts, Christina

This project consists of a series of large scale paintings which are informed by the concepts of superstructure and the heterotopic. The paintings, cinematic construction, begin with personal and appropriated imagery, combining memory and form into images of wild escapes such as vacation bungalows in a desolate landscape. These vacationlands appear dangerous but a strange humor exists in the odd imagery like gravity defying stilts. Elements, such a sweet and saccharin colors, add a natural reprieve from the serious subject matter.

Cited by 0

Superstructure

Yasuhisa Okumoto, Tetsuo Okada, Yu Takeda et al. · 2026

Cited by 0

Superstructure

Daniela Lucía Danelinck, Mariano Nicolás Campos · 2022

The term “superstructure”, which literally refers to a construction over the floor—which is why it can also be translated as “building”—comes from Marx's famous architectonic metaphor. The different Lacanian discussions deserve an independent analysis, starting with The Freudian Thing of 1955 and Lacan's first reference to “Stalin's Theorem” that brings into question the place of language in the architectural metaphor. During the long period of time Lacan devoted great effort to the formalization of an impossible relation between two levels or heterogenous aspects, and that is where the development of the vel of alienation, the discourse matheme, and topology patiently await the time for their reception by a new generation of Marxist theoreticians, as necessary theoretical inputs to reanimate the old problem of the foundation/superstructure relation.

Cited by 0

Superstructure

Yasuhisa Okumoto, Yu Takeda, Masaki Mano et al. · 2009

Cited by 0

U1h Superstructure

Sykes, Glen · University of North Texas Digital Library (University of North Texas) · 2000

The U1H Shaft Project is a design build subcontract to supply the U. S. Department of Energy (DOE) a 1,045 ft. deep, 20 ft. diameter, concrete lined shaft for unspecified purposes. The subcontract awarded to Atkinson Construction by Bechtel Nevada to design and construct the shaft for the DOE has been split into phases with portions of the work being released as dictated by available funding. The first portion released included the design for the shaft, permanent hoist, headframe, and collar arrangement. The second release consisted of constructing the shaft collar to a depth of 110 ft., the service entry, utility trenches, and installation of the temporary sinking plant. The temporary sinking plant included the installation of the sinking headframe, the sinking hoist, two deck winches, the shaft form, the sinking work deck, and temporary utilities required to sink the shaft. Both the design and collar construction were completed on schedule. The third release consisted of excavating and lining the shaft to the station depth of approximately 950 feet. Work is currently proceeding on this production sinking phase. At a depth of approximately 600 feet, Atkinson has surpassed production expectation and is more than 3 months ahead of schedule. Atkinson has employed the use of a Bobcat 331 excavator as the primary means of excavation. the shaft is being excavated entirely in an alluvial deposit with varying degrees of calcium carbonate cementation. Several more work packages are expected to be released in the near future. The remaining work packages include, construction of the shaft station a depth of 975 ft. and construction of the shaft sump to a depth of 1,045 ft., installation of the loading pocket and station steel and equipment, installation of the shaft steel and guides, installation of the shaft utilities, and installation of the permanent headframe, hoist, collar utilities, and facilities.

Cited by 0

U1h Superstructure

Glen A. SYKES · University of North Texas Digital Library (University of North Texas) · 2000

The U1H Shaft Project is a design build subcontract to supply the U. S. Department of Energy (DOE) a 1,045 ft. deep, 20 ft. diameter, concrete lined shaft for unspecified purposes. The subcontract awarded to Atkinson Construction by Bechtel Nevada to design and construct the shaft for the DOE has been split into phases with portions of the work being released as dictated by available funding. The first portion released included the design for the shaft, permanent hoist, headframe, and collar arrangement. The second release consisted of constructing the shaft collar to a depth of 110 ft., the service entry, utility trenches, and installation of the temporary sinking plant. The temporary sinking plant included the installation of the sinking headframe, the sinking hoist, two deck winches, the shaft form, the sinking work deck, and temporary utilities required to sink the shaft. Both the design and collar construction were completed on schedule. The third release consisted of excavating and lining the shaft to the station depth of approximately 950 feet. Work is currently proceeding on this production sinking phase. At a depth of approximately 600 feet, Atkinson has surpassed production expectation and is more than 3 months ahead of schedule. Atkinson has employed the use of a Bobcat 331 excavator as the primary means of excavation. the shaft is being excavated entirely in an alluvial deposit with varying degrees of calcium carbonate cementation. Several more work packages are expected to be released in the near future. The remaining work packages include, construction of the shaft station a depth of 975 ft. and construction of the shaft sump to a depth of 1,045 ft., installation of the loading pocket and station steel and equipment, installation of the shaft steel and guides, installation of the shaft utilities, and installation of the permanent headframe, hoist, collar utilities, and facilities.

Cited by 0

U1h Superstructure

Glen Sykes · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2009

The U1H Shaft Project is a design build subcontract to supply the U. S. Department of Energy (DOE) a 1,045 ft. deep, 20 ft. diameter, concrete lined shaft for unspecified purposes. The subcontract awarded to Atkinson Construction by Bechtel Nevada to design and construct the shaft for the DOE has been split into phases with portions of the work being released as dictated by available funding. The first portion released included the design for the shaft, permanent hoist, headframe, and collar arrangement. The second release consisted of constructing the shaft collar to a depth of 110 ft., the service entry, utility trenches, and installation of the temporary sinking plant. The temporary sinking plant included the installation of the sinking headframe, the sinking hoist, two deck winches, the shaft form, the sinking work deck, and temporary utilities required to sink the shaft. Both the design and collar construction were completed on schedule. The third release consisted of excavating and lining the shaft to the station depth of approximately 950 feet. Work is currently proceeding on this production sinking phase. At a depth of approximately 600 feet, Atkinson has surpassed production expectation and is more than 3 months ahead of schedule. Atkinson has employed the use of a Bobcat 331 excavator as the primary means of excavation. the shaft is being excavated entirely in an alluvial deposit with varying degrees of calcium carbonate cementation. Several more work packages are expected to be released in the near future. The remaining work packages include, construction of the shaft station a depth of 975 ft. and construction of the shaft sump to a depth of 1,045 ft., installation of the loading pocket and station steel and equipment, installation of the shaft steel and guides, installation of the shaft utilities, and installation of the permanent headframe, hoist, collar utilities, and facilities.

Cited by 0Open access

Superstructure Representation

Cheng Seong Khor · 2023

This chapter introduces various superstructure-based representations in formulating mixed-logical-and-integer optimization models for process design and synthesis. A number of such representations exist that give rise to efficient (and accurate) formulations of models incorporating important design and structural specifications of the process synthesis problem of interest. A superstructure considers or encapsulates most if not all possible alternatives (or permutations) of the elements represented, for example, the physical state of a material stream and the task of operation of an equipment such as that employed in the widely adopted state–task network superstructure representation.

Cited by 0Open access

U1h Superstructure

Glen Sykes · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2009

The U1H Shaft Project is a design build subcontract to supply the U. S. Department of Energy (DOE) a 1,045 ft. deep, 20 ft. diameter, concrete lined shaft for unspecified purposes. The subcontract awarded to Atkinson Construction by Bechtel Nevada to design and construct the shaft for the DOE has been split into phases with portions of the work being released as dictated by available funding. The first portion released included the design for the shaft, permanent hoist, headframe, and collar arrangement. The second release consisted of constructing the shaft collar to a depth of 110 ft., the service entry, utility trenches, and installation of the temporary sinking plant. The temporary sinking plant included the installation of the sinking headframe, the sinking hoist, two deck winches, the shaft form, the sinking work deck, and temporary utilities required to sink the shaft. Both the design and collar construction were completed on schedule. The third release consisted of excavating and lining the shaft to the station depth of approximately 950 feet. Work is currently proceeding on this production sinking phase. At a depth of approximately 600 feet, Atkinson has surpassed production expectation and is more than 3 months ahead of schedule. Atkinson has employed the use of a Bobcat 331 excavator as the primary means of excavation. the shaft is being excavated entirely in an alluvial deposit with varying degrees of calcium carbonate cementation. Several more work packages are expected to be released in the near future. The remaining work packages include, construction of the shaft station a depth of 975 ft. and construction of the shaft sump to a depth of 1,045 ft., installation of the loading pocket and station steel and equipment, installation of the shaft steel and guides, installation of the shaft utilities, and installation of the permanent headframe, hoist, collar utilities, and facilities.

Cited by 0Open access