Skip to content
Free planNo credit card requiredStart writing

Search 250 million research papers

Read the abstract, see who wrote it and who cites it, and get the citation in APA, MLA, Chicago or Harvard.

About 10,000 papers for “surface facilities”

Surface Transport Facilities 22.

United States Army Service Forces, Office of the Geographer, Department of State, A. Hoen & Co., Inc. et al. · 1943

Cited by 0

GIS of Surface Facilities

H. F. Pochettino, G. Kovacs · Proceedings of SPE Latin American and Caribbean Petroleum Engineering Conference · 2001

GIS of Surface Facilities H.F. Pochettino; H.F. Pochettino Repsol YPF Search for other works by this author on: This Site Google Scholar G. Kovacs G. Kovacs Repsol YPF Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, Buenos Aires, Argentina, March 2001. Paper Number: SPE-69656-MS https://doi.org/10.2118/69656-MS Published: March 25 2001 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Pochettino, H.F., and G. Kovacs. "GIS of Surface Facilities." Paper presented at the SPE Latin American and Caribbean Petroleum Engineering Conference, Buenos Aires, Argentina, March 2001. doi: https://doi.org/10.2118/69656-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Latin America and Caribbean Petroleum Engineering Conference Search Advanced Search AbstractIn all commercial activity, in order to increase the business objective, that is the rentability, the corresponding Administrations work for the maximization of the investments efficiencies.Each increase in the celerity and precision of the information feed-back process will become in an increase of the benefits because the deviations from the budget and the corresponding actions will be the smallest.In the Oil Industry an index commonly used, that include the costs started in the different stages of the production process, is the Operative Cost.Because Surface Facilities are part of the Production System, theirs costs will increase the Operative Cost.One form to optimize the Surface Facilities cost is by the automation of the Surface Facility's Information Systems so as to reduce answer times. Computing is one tool to find this automation.GIS is a computing tool developed for integrate information and bases its work in the administration of the information related to points placed over the Earth surface.The present job shows the GIS Project developed for the Vizcacheras Field Surface Facilities, Province of Mendoza, Argentine Republic.IntroductionIn all commercial activity, and in order to improve the profitability of the business, Administrations work in the sense of adding value for their shareholders.The infrastructure for the taking of decisions is conformed by the group of the characteristic indicators of each activity and the economic results. These data will allow the Direction to have the necessary feedback information to adjust the deviations regarding the traced goal, that is to say, to adjust their interests with those of the shareholders.All increment in speed and in precision in this information regarding will be in an increment of the benefit because the deviations from the budget and the corresponding corrective actions will be the minimum.In a process means of value application and the corresponding ones likewise for obtaining the feedback information can be manual, automated or mixes of both methods. In the first case man works in a principal place because he is in the execution line without any support. In the second case man function is as a supervisor of the automatic systems that are those which are in the execution line, he uses these for his comfort; they not only execute but also inform him. In the real work world processes are mixture of both methods. The market tendency is to increment the automatism, like computing, robotics, communication, etc.. These methods are speedier than the man because they reduce the taking of decisions time and, therefore, optimize the profitability of the business.Figure N° 1 schematized a process with value application and the automation insert form.A common indicator in the petroleum industry, that contemplates the costs originated in the different stages of the production process, is the Operative Cost. Administrations will develop their activity in order to optimize it. Because the Surface Facilities are part of the production system the cost of the different items of this system will contribute to the Operative Cost. An efficient Administration that optimizes the Operative Cost will optimize, in consequence, the participation of all the costs that contribute to it and therefore the corresponding to the Surface Facilities.A form to contribute the optimization of the Surface Facilities cost is by the automation of its information systems, so as to reduce the answer times. Computing is one of the tools that allow this automation.GIS is a computing and an integrative tool of the information that belongs to the first level of the scale of the business or base information (in the petroleum industry this information will be, for example, Projects documents, Geology documents, Reservoirs documents, etc.). Keywords: implementation software, dir información, information, software, ingeniería, surface facility, application, información, obra, dir toda Subjects: Information Management and Systems This content is only available via PDF. 2001. Society of Petroleum Engineers You can access this article if you purchase or spend a download.

Cited by 0

Surface Facilities for a CO

Hisham Saadawi · 2010

Surface Facilities for a CO2-EOR Project in Abu Dhabi Hisham Saadawi Hisham Saadawi Abu Dhabi Company for Onshore Oil Opertions (ADCO) Search for other works by this author on: This Site Google Scholar Paper presented at the SPE EOR Conference at Oil & Gas West Asia, Muscat, Oman, April 2010. Paper Number: SPE-127765-MS https://doi.org/10.2118/127765-MS Published: April 11 2010 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Saadawi, Hisham "Surface Facilities for a CO2-EOR Project in Abu Dhabi." Paper presented at the SPE EOR Conference at Oil & Gas West Asia, Muscat, Oman, April 2010. doi: https://doi.org/10.2118/127765-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE EOR Conference at Oil and Gas West Asia Search Advanced Search Abstract The Government of the UAE aspires to reduce green gas emission by capturing carbon dioxide (CO2) from industrial emitters and transporting the CO2 to oilfields for Enhanced Oil Recovery (EOR).In order to demonstrate and test this concept, Abu Dhabi Company for Onshore Oil Operations (ADCO) recently implemented a pilot-scale CO2 Enhanced Oil Recovery in one of its onshore oil fields. This is the first ever CO2-EOR flood to be implemented in the Middle East.This paper gives the background to this unique project and describes the pilot facilities and project execution plan. Keywords: society of petroleum engineers, oil production, surface facility, climate change, middle east, co2-eor project, co 2, oil field, spe 127765, pilot project Subjects: Improved and Enhanced Recovery, Environment, Chemical flooding methods, Climate change Copyright 2010, Society of Petroleum Engineers You can access this article if you purchase or spend a download.

Cited by 0

Surface Facilities Development for Mature Fields

R. Morales, Jorge Navarro‐Ortiz · 2007

Abstract This work shows the main considerations adopted and proved successful for oilfield reactivation and production increase through the handling of very high gross production flow rate with high water/oil ratio. The execution strategy is focused on maximizing the production anticipation in the short-term by taking maximum advantage of the existing facilities and, in the mid- term, by developing facilities with new systems sized with flexibility and supplying them timely. All of these allowing to take advantage of the most suitable technologies existing in the market for handling, separation, treatment and disposition of high produced water flow rates, during the lifetime contract for each oilfield. Examples of this approach are the study cases presented related to water injection for secondary recovery and disposal purposes. The knowledge obtained during the development and operation of a given mature field, has been adapted for its application in another field, and so on, considering particular features and different contractual terms, allowing PESA to success in very mature oilfields with apparently very restricted development opportunities.

Cited by 1

Integrated Reservoir-Surface Facilities Network Analysis

Wahyu Djatmiko · 2018

Abstract Accuracy in reservoir performance prediction is a key in successful oil field management. There are methods available for this purpose including a reservoir simulation technique! This technique is normally used for its comprehensiveness and it's ability to design the desired scenarios to exploit the hydrocarbon resources. Modeling of a massive reservoir (average gross thickness exceeds 100 ft) using current reservoir simulation technology is quite attractive. However, modeling multi-layer reservoirs with more than 100 reservoir layers, such as reservoirs in deltaic environments, is prohibitive. This is due to the required cells to model these reservoirs, perhaps beyond the computer memory capacity. In this case, reservoir modeling is limited to a number of reservoirs. Other reservoir performance predictions are obtained by using an analogy method. Another technique to handle a multi-layer reservoir system is to use the Decline Curve Analysis. This paper proposes a method to predict reservoir performance in a multi-layer system where the reservoir simulation technique is impractical. This method integrates reservoir performance and surface facilities network analysis to obtain the field's production rate. The production rate is calculated using an appropriate IPR curve. The curve is validated using existing production data. Using this technique, any surface facilities performance changes affect the reservoir performance. As a result, the predicted flow rate in the determined point (e.g. gathering station) may be calculated immediately. The network analysis calculates pressure or flow rate of any nodes in the network. The algorithm used in this calculation is very simple and may be applied to several pressure traverse correlations such as Hagedorn-Brown, Beggs and Brill, Azis-Govier and Mukherjee and Brill methods. These correlations may be validated using flowing pressure measurements. A complex network is solved by separating independent hybrid pipelines from the whole network and solving them individually without violating the network pressure loss constraints. Using this technique, the nodes pressure or flow rate is calculated effectively. Since this technique requires no matrix computation, it is independent of any initial guesses normally used in current methodologies. This technique may be regarded as a reservoir-network simulator.

Cited by 0

Yucca Mountain Project Surface Facilities Design

P.W. McDaniel, Norman Brown, P.G. Harrington et al. · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2002

With the recent designation of the Yucca Mountain site as a proposed repository for the disposal of commercial spent nuclear fuel, DOE spent nuclear fuel and high- level waste, work is proceeding on the design of surface facilities to receive, unload, and package the waste into waste packages for emplacement in the repository. This paper summarizes recent progress in the design of these surface facilities.

Cited by 1Open access

Exergy Pada Surface Facilities Lapangan Panasbumi Hululais

Eko Widi Pramudiohadi, Maria Theresia Kristiati Eko Andreastuti · Jurnal Mineral Energi dan Lingkungan · 2022

Abstrak. Lapangan Hululais, adalah lapangan panasbumi di bawah menejemen PT Pertamina Geotermal Energi, akan membangun 2 x 55 Mwe, Tahap pertama membangun 1x55 Mwe, dengan memilih tekanan kepala sumur tertentu dari out put curve untuk dapat memenuhi pembangunan tahap pertama.Peneliti mencoba menghitung dalam rangka pemenuhan kebutuhan tahap pertama dengan jalan menghitung penurunan entalpi fluida merupakan fungsi tekanan dan temperatur fluid, profil kehilangan tekanan diperoleh dari persamaaan Beggs dan Brill dan profil kehilangan temperatur dari hukum keseimbangan energi, dengan menggunakan manipulasi matematika Newton Rapson dua dimensi, untuk mendapatkan penurunan tekanan dan temperatur secara serentak pada suatu segmen pipa. Sedangkan exergy merupakan energi yang berguna setelah dikurangi panas yang terbuang kesekitar disamping kehulu, dengan melihat exergy di kepala sumur, di input separator dan input turbin yang terkecil merupakan pilihan yang optimum. Disamping itu daya yang dapat dibangkitkan oleh pembangkit merupakan fungsi dari entalpi dan massa uap.Hasil yang optimum dari skenario ke tiga , menyatakan, pada pipa dua fasa 16 inch hingga 28 inch sedangkan pada pipa satu fasa uap menggunakan diamater 16 inch sd 36 inch, semua pipa dilapisi dengan isolasi 8 cm, menggunakan rockwooll isolasi, pada pipa dua fasa, besarnya kehilangan tekanan 0,623 bar, penurunan temperatur 1,9083 oC, dan menghasilkan penurunan entalpi 0,211 kj/kg dan pipa satu fasa uap kehilangan tekanan 3,8761 bar, penurunan temperatur 14,6922 oC, dan penurunan entalpi 13,783 kj/kg. Jarak antara separator dan turbin bevariasi, dari jarak yang terjauh 6460 m sampai yang terdekat berjarak 1824 m, dengan diameter terkecil separator 1,29 m dan diameter terbesar 1,73 m, sampai turbin inlet, massa uap yang masuk 94,01 kg/s,tekanan 8,45 bar, temperatur 177,4 oC, harga exergy di turbin 76,77 MWth, Daya yang dapat dibangkitkan 56,431Mwe.

Cited by 1Open access

Management of Runoff from Surface Transportation Facilities

Stuart Stein, G. K. Young, David R. Pearson et al. · 2000

This project, which is funded by the National Cooperative Highway Research Program, includes both a synthesis of current information and a plan to guide future research. The issues to be studied include regulations and permitting, runoff water quality characteristics, best management practices, receiving water impacts, and habitat impacts. The tasks include a detailed review of existing information plus digitization of key information and software development to identify gaps in the current state of knowledge. A nationwide survey of experts will assist in identifying existing information. After the information has been scanned to identify gaps, the team will identify and prioritize future research to fill the gaps. This research plan will then influence future NCHRP funding on highway runoff research projects.

Cited by 0

Surface Facilities Management for Thermal Recovery Processes

Adel A. Heiba, Santanu Barua, Kunal Dutta-Roy · International Thermal Operations and Heavy Oil Symposium · 1997

Abstract Following the delineation and development of a field, the recovery of oil by cyclic steam stimulation and other thermal methods is controlled by actions taken at the surface. A number of operational variables effect the optimal management of steam stimulation programs. Generally these variables relate to the generation and allocation of steam for injection at production wells. Because the number of variables can be large, the management of steam stimulation programs is seen to require that solutions be found to constrained multivariate optimization problems. In this paper, a novel and integrated approach is presented to the optimal management of cyclic stimulation programs. The approach combines the use of technologies to simulate the flow of steam in networks and wellbores with an industrially tested variant of the Successive Quadratic Programming algorithm (SQP) for process optimization. Examples are presented that illustrate the ability of the integrated approach to optimize the allocation of steam in distribution systems for which (1) the objective is to minimize the loss of thermal energy in surface piping and wellbore tubing, and (2) the objective is to increase the value of oil production that follows stimulation. Extensions of the approach to more realistic allocation problems are found (i) to require the inclusion of steam generation costs in the formulation of optimization problems, and (ii) to require the incorporation of mechanistic reservoir models for the stimulation of oil production by steam injection.

Cited by 5

Design of Surface Facilities for Khuff Gas

L. K. Sood, A. S. Jamsheer · SPE Production Engineering · 1986

Summary Although it was discovered in 1947, commercial exploitation of the Bahrain Khuff reservoir began in 1970. Current gas demand stands at 580 MMscf/D [16.4 × 106 std m3/d] and is growing rapidly. This paper briefly discusses the evolution of the design for surface facilities and field experience. The established design parameters could be used for the design of surface facilities for similar reservoirs.

Cited by 3

Coagulation monitoring in surface water treatment facilities

Water Science & Technology · 1998

Coagulant dosing is traditionally determined according to results from jar-tests or operator's experience, which often lead to overdosing or insufficient dosing. In this study, the feasibility of applying an optical monitoring technique to determine chemical dosage and to monitor the coagulation performance in water treatment plants were assessed. To examine the applicability of the monitor under various operation conditions, series of batch trials in the field were conducted to explore the effects of turbidity, pH and rapid mixing intensity on the effectiveness of coagulation. The performance was directly reflected in the output ratio of the monitor, which proved to be an effective index for the floc size and its settling velocity. Therefore, we consider that the optical monitor is an useful instrument in monitoring coagulation in water treatment.

Cited by 16

REPOSITORY SURFACE FACILITIES PRIMARY SYSTEM CRANE DATA

K.E. Schwartztrauber · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2005

The purpose of this calculation is to compile crane design data for the mechanical primary structures, systems, and components (SSCs) required for the repository Waste Handling Building (WHB) and Carrier Preparation Building (CPB). The work presented in this document has been prepared in accordance with Office of Civilian Radioactive Waste Management approved program document AP-3.12Q, Calculations. This calculation has been developed to supplement information previously prepared using the development plan for ''WHB/WTB Space Program Analysis for Site Recommendation'' (Reference 5), which concentrates on the primary, primary support, facility support, and miscellaneous building support areas located in the WHB and Waste Treatment Building (WTB). The development plan was completed in accordance with AP-2.13Q, ''Technical Product Development Planning''. The work in this calculation is a continuance of the work described in the previous development plan; therefore, in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', a new Technical Work Plan is not required.

Cited by 1Open access